Garbage Truck Tailgate - Assembly Rig

The design and engineering of the facade for the Museum of the Future in Dubai represent a breakthrough in complex geometry, advanced materials, and integrated services. The engineering approach, led by Buro Happold, utilized Building Information Modeling (BIM) and parametric design to transform the fluid, artistic vision into a buildable reality.

Design Optimization

Unifying the design to make a single Rig that can mount all the tailgates

 

Picture23

Standardization and Configuration Management

Analyzed 7 different tailgate designs ranging from 2 ton to 6.5 ton

Picture24

Kinematics and Hydraulics Design

Hydraulic Actuated mechanism to tilt the assembly from 0°-70° angle.

This replicates the actual assembly position of the tailgate on the truck

 

Picture22

Design Validaton via FEA

FE Analysis and Design Optimization at all the critical locations with 3 factor of safety

Picture20

Value Engineering via Engineering Excellence

Test Rig replaces the need to have a €100,000 truck in place to complete the tailgate assembly

Picture21
Scroll to Top